How to complexity after installing the stretch ceiling?

What situations can be encountered after installing the stretch ceiling to the PVC profile

The first is very dangerous for suspended ceilings is the breakdown of the electric cable in the walls and on top in the places of drilling holes. This situation can be prevented by receiving an electrical communications scheme from the room where the installation will take place.

If the circuit does not exist, then you can sketch it yourself using sensors to detect wiring in the walls. Thus, having received the wiring card, we not only eliminate difficulties at the time of installation of the stretch ceiling, but also for the future.

Such errors occur during installation, both random and cuts on the canvas. This can be avoided in advance prepared room for work, namely the presence of all the necessary tools and the absence of any unnecessary items.

If you install a fabric stretch ceiling and made at a distance of about one centimeter from the profile, such an error can be corrected. Canvas and pull the cut.

Such errors occur during installation, both random and cuts on the canvas. This can be avoided in advance prepared room for work, namely the presence of all the necessary tools and the absence of any unnecessary items.

If you install a fabric stretch ceiling and made at a distance of about one centimeter from the profile, such an error can be corrected. Canvas and pull the cut.

If such a situation exists at the customer, then one way out is to change everything. A cut in the stretch ceiling made of PVC film, you can try to repair it if the damage was formed near the wall, the film can be removed from the profile at a distance of several centimeters and the damaged piece cut off.

Glue the harpoon with special glue, and reheat it again using a heat gun and install PVC in the profile. The hole at a great distance from the wall is hidden by installing additional lamps or a ventilation grille.

Second, sticking of the stretch ceiling to the main one also happens after installation, in the case when heated air comes out through the overlap, negative pressure is created in the space between the main and stretch ceilings. Then the material is tightened to the main ceiling and begins to cling to the fasteners.

This situation is solved in two ways, if the air flow movement was not provided for by the plan and occurs through the gaps in the ceiling. Existing damage must be repaired and then sealed.

When the existing air flow from one room to another is provided and it is necessary to solve this issue, the installation of grates in each room allows. In this case, the negative pressure will be compensated. The third, not correctly established profile can become one more problem at installation of a stretch ceiling. This happens in the following cases: screws are located at a great distance from each other. Either the wall was very loose.

In the first case, just add a certain amount of screws to the existing ones. And check the PVC baguette for separation from the wall. The most optimal variant of the distance between fastenings is 15 centimeters.

In the case of a loose wall, you need to similarly reinforce a PVC baguette with additional screws, but with the same dowel. We unscrew a little self-tapping screw and set a little diagonal second to first one. If necessary, twist the third screw.

The fourth, wrong sequence of installation of PVC film in a two-tier aluminum construction. If you first set the material to the upper level. Then, then most likely there will be difficulties when installing a lower level that is closer to the floor. Whatever this happens, always install the lower level of the structure first and then the upper one.